PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Derrick -6 (4th Floor and Roof) Facing North (800x600).jpg Derrick -7 (2nd Floor) Facing South (800x600).jpg Derrick -7 (2nd Floor) Facing West (800x600).jpg Erecting Derrick -7 (2nd and 3rd Floor) Facing South-East (800x600).jpg Derrick -7 (2nd Floor) Facing South-East (800x600).jpg Foam insulation along column lines K-L Facing South-East (800x600).jpg Installed steel angles at Stair -2-Elev. 4 (4th Floor) for the metal decking Facing South (800x600).jpg
Previous pageNext page Derrick -7 (2nd Floor) Facing West (800x600)
Derrick -7 (2nd Floor) Facing West (800x600)